Customization: | Available |
---|---|
Type: | Single-mode Fiber |
Connection Structure: | SC |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
UNDERGROUND DROP CABLE,1CORE, SC/APC,UPC
With two jackets, reinforced by two steels
Type Length (m) XXM
SIM-FTTH -UNDERGROUND CABLE SC-SC-M001-M300 1 to 300m
Length tolerance (m)
L ≤15 m+0.3%
L >15m +0.2%
Cable section:
Assembly
Cable sizes | 5.7+/-0.3mm |
Connector type | A: SC/UPC , SC/APC, SM |
Insertion loss | <=0.3+0.4*L/1000dB, @1310nm <=0.3+0.3*L/1000dB, @1550nm According to IEC-61300-3-4 Method B |
Connector type | B: SC/UPC , SC/APC, SM |
Insertion loss | <=0.3+0.4*L/1000dB, @1310nm <=0.3+0.3*L/1000dB, @1550nm According to IEC-61300-3-4 Method B |
Return loss | >=55dB according to IEC-61300-3-6 SC UPC |
Return loss | >=55dB according to IEC-61300-3-6 SC APC |
Q1:Can u provide us with samples?
Ans1: Yes, we can provide 1 to 2pcs samples for free.
Q2:If we need customized/OEM product, Can u supply?
Ans2: Yes,Customized/OEM product/artwork is available for us. Professional designers, Advanced technicians and mold modifications department ensure that we will make the exact model for u accordingly.
Q3:If u can accept small trial order?
Ans3: Yes, small trial order is accepted.
Q4:What payment terms available for u?
Ans4: We accept TT, LC, Alipay etc.
Q5:Can u offer discount?
Ans5: Yes, Discount available on large order. The larger the order, the more discount we will offer.
Q6:What is ur delivery time?
Ans6: Usually, delivery will be made within 2 weeks after down payment; If order very large,one month we will need. Please note, delivery time is production time, and shipping time not included. If u want to know, we can help u consult shipping company for details.